Monday, November 15, 2010

Swiss L-glutathione Soap

Rauris sits panning for gold to 120 tons of pure gold




As former mayor Kaiserer gold & greed on the mountain prevented



The gold reserves in Rauris
In Goldberg group is to Rauris it still mineable the tunnel a rich deposits of gold and silver promise. This is called 6-speed groups, the following gold contained in Deberzgehalt.
geologist Beck (1907 - 1977) speaks of 8 Grams of gold in a ton of ore. Imhof even of 10.6 grams of gold from one ton of ore Due to the fact that at least 15 million tonnes of ore to reduction are relevant to the Berrechnung this would yield a pool of 120 tons of pure gold yield.

Even higher estimates range from 18 to 25 million tonnes of quantities of ore, which would be the gold yield amounted to 140 to 201 tonnes of pure gold. Furthermore, the ore pulp containing another 1,000 tonnes of silver. This begs the question why is carried out with such a quantity of pure gold in the mountain no degradation of these precious metals. The answer lies in the far-flung tunnels and mines at a height of 2,300 over 2,900 and even 3,000 meters (Schwarzkogl Summit) located.

The highest tunnel is built at an altitude of 3045 meters. And the highest Berghausruiene with the Smith house was discovered in the thirties by G. Leitner Hiess at an altitude of 2730 meters. The depth of the gold deposits ranging up to 1,600 meters into the mountain.


For extraction of gold would have a huge capital expenditure that is operated. Treatment plants, miles of tunnels underground, and new lifts to be installed. Prevent further disruption, displacement and fragmentation means of access to gold deposits. Rauris sitting there on at least 120 tons of pure gold.

There are in Kanppenzunft of Rauris and Gastein is a proverb which says: "The calf was gone - the cow still inside, in the Mountain" describes this Auspruch that since the beginning of the gold mining industry by the Celts and the Romans until the year 1943, only a fifth of the pure gold was brought to light. 80% of gold are still inside the Rauriser Gold Mountain.



1984 Kaiserer prevented is gold & greed on the mountain


Only the former mayor Ing Otto Kaiser and a few colleagues and the Austrian Friends of Nature to thank for the U.S. ST. Joe Erzbaugesellschaft on Goldberg could not take root. The St. Joe Company planned to invest 72.6 million euros and create 500 well paying jobs. In a press conference, the former exploration manager Volker Spieth, that to reduce 100 tonnes of gold in 20 years. At that amount of gold production a reduction would be 200-800 tons of rock daily necessary.

The Golden future for Rauris had only one catch and was called the: sodium cyanide. A highly toxic chemical with the gold from the ore rock is formally sulphurised out. But even with these highly toxic substances the targeted result Währe never zuschaffen been. Ing Otto Kaiser and his colleagues feared (rightly) serious damage to nature and Raubau his home town and prevented by all means the occurrence of the degradation by the St. Joe Erzbaugesellschaft.

We know the villages of South America is out with mercury mined for mineral resources and has been. Poisoned rivers and soils, disease, epidemics, poverty, slums, cleared and burned forests. Where to even mention, is that mercury is still considered the more harmless methods instead of the highly toxic sodium cyanide .


thanks to former mayor Ing Otto Kaiser

Our thanks to former mayor therefore prevents Ing Emperor (+) allowing an utter destruction of the current protected area in Rauris added. While the former official posting their project and proponents of the insanity, described him as an agent and Frustrate the mining plans, the people know of the Rauris Valley and in the meantime, a large part of nature connected people how valuable was this commitment to Rauris and the environment.

0 comments:

Post a Comment